본문 바로가기
Safety/JSA_JHA (위험성평가)

19. Instrument Installation

by Pkassy 2022. 12. 14.
728x90

The instrument installation is in designing, specifying, procuring, calibrating, installing, piping, loop checking, commissioning and maintaining instrumentation and control systems for a wide range of industrial and commercial process controls, ensuring that the plant operates safely.

Hazard Category Hazards Controls
Defective Equipment 1. Accidents can occur
   through the use of
   faulty and/or defective
   or by the installation of
   equipment with
   insufficient rating for
   the task
1. All equipment shall be visually inspected for defects 
   prior to installation.
2. All equipment being installed shall comply with relevant
   ACOP(Approved Code of Practice)'s and safety standards
   and be the correct rating for the task.
Nips, Cuts and/or 
Abrasions
1. Can occur through 
   contact with sharp
   edges on instruments or
   if hands and fingers
   become trapped during
   the installation process.
1. Personnel protective equipment (PPE) shall be worn at 
    all times when handling sharp or otherwise potentially
    hazardous materials.
2. A "Safe System of Work" shall be implemented to 
   reduce the possibilities of accidents/incidents caused by
   a lack of communication, utilizing "Tool box talks"
   (if necessary).
3. All sharp edges shall be removed or dressed immediately.


Falls of Materials 
and/or Tools
1. Accidents can occur
   through items being
   dropped during the
   installation process.
1. Materials and tools shall be kept secure at all times
   during the installation process.
2. Barriers shall be erected beneath the installation area to 
   restrict access of other personnel (where required).
3. Alternative access shall be made available if the normal 
   access/egress is obstructed.
Fall of Personnel 1. Accidents can occur if 
   suitable access/egress is
   not provided and
   maintained to the
   installation area at all
   times, during the
   installation process
1. Safe access/egress shall be maintained to the work area
    at all times.
2. Please refer to relevant risk assessment, i.e. working on 
    scaffolding, working off ladders, working off stepladders

계장기기/기구/장치/케이블 등등 모든 작업을 여기에 기재 할 수 없죠!!

JSA(Job Safety Analysis) 를 준비할 때에 관련된 작업내용을 같이 확인해보시길 바랍니다.

Process Safety (공정안전)에 관심이 있으시면, P&ID 부터 시작하세요~

728x90

'Safety > JSA_JHA (위험성평가)' 카테고리의 다른 글

21. Leak test of Pipes  (0) 2022.12.15
20. Insulation for piping and equipment  (0) 2022.12.14
18. Hydrotest  (0) 2022.12.14
17. HVAC Duct Installation & Insulation  (0) 2022.12.14
16. HDPE Installation  (0) 2022.12.14